One KL: Cementaid's Caltite system for the basement

One KL: Cementaid's Caltite system for the basement

Pages 2 Pages

Project Page: One KL One KL The One KL development is conveniently located in front of the 5 star Mandarin Oriental Hotel or within the Petronas Twin Towers boundaries. Good location as it is, the site is very much disturbed by heavy traffic in the vicinity. The Contractor Shimizu during planning stage has already fixed his mind on Cementaid's Caltite system to the basement. The basement is 3 levels deep and under high hydrostatic pressure. Moreover, with such short construction period, other waterproofing system which requires a long list of installation detailings may not be desirable. Completion Date: Jan 1, 2010 1 / 2 Architect: SCDA Architects Pte Ltd Contractor: Shimizu Corpor Structural engineer: RSP Singapore Products Used: Everdure Caltite Address: Jalan Pinang, , Kuala Lumpur