Case Study

Residential Development at One Balmoral Road: Aquapel System for basement slabs and Everdure Caltite System for basement skin wall for car park usage

Residential Development at One Balmoral Road: Aquapel System for basement slabs and Everdure Caltite System for basement skin wall for car park usage

Pages 2 Pages

Project Page: Residential Development at One Balmoral Road 1 / 2 Residential Development at One Balmoral Road Residential project by Hong Leong Holdings. Having work with the Main Contractor on the previous project, they approach Cementaid for the Waterproofing proposal on this project. After study through the drawings from the Main Contractor, we proposed Aquapel System to basement slabs and Everdure Caltite System for 150mm thick basement skin wall which is meant for car park usage. 3CC System for 1st storey exposed deck and suspended swimming pools, Everdure Caltite System for the roof slab and open terraces. With our proposal and products on board, the main contractor has again enjoyed great saving on site overheads by having a shorter construction time frame. Also, instead of usin

Join for free to read