Case Study
Offshore Operator Saved USD 21 Million Over 6 Years
Case History Five wells in a mature offshore western North American oil ? eld were producing from two zones at 10,000 feet via gas lift systems. In addition to supplying the gas lift systems, natural gas from the wells was contractually committed to a local industrial plant. When gas production declined to levels insuf? cient to support both the gas lift systems and the contract, the operator was faced with either drilling new wells to