Case Study
Offshore ESP Runs Nearly 10 Years in China
Case History An operator’s offshore oil ? eld in China was using a competitor’s arti? cial lift system. The electrical submersible pumping (ESP) system did not meet the customer’s run life requirements, so the customer was looking to increase daily production and run life. Baker Hughes installed new ESP equipment to increase the ? ow rate. The ESP system consisted of 152-hp KMH motor, a single GSB3DB seal, and a 204-stage FC2200 pump.