CASE STUDY OFFICE REFURBISHMENT Air Options was appointed to undertake the supply and installation of a high grade Exposed installation for a 3-storey o&ce refurbishment. Works consisted the supply and installation of 5x Mitsubishi Electric VRF systems connecting to multiple ducted type units. Installation also required the tment of heat recovery ventilation units serving each of the oors and local extraction from toilets. We where also involved in the BMS integration of the building mechanical services. The installation being exposed was completed to the highest standards and included the use of specialist twin wall thermally insulated spiral ductwork, designed to retain a standard duct nish, however, benet from no risk of condensing in cooling operation. These systems are: 