Case Study
OFFICE REFURBISHMENT FULL HVAC REPLACEMENT
CASE STUDY OFFICE REFURBISHMENT FULL HVAC REPLACEMENT Air Options was appointed to undertake the replacement and refurbishment of the majority of the HVAC systems with an existing building for a new tennat prior to them taking occupancy. The new systems where supplied and installed to take into account the tenants o&ce and specic layout requirements to include specialist production and manufacturing facilities. Works involved the initial site level validation and assessment of existing services so all parties had a understanding of the existing as found condition including water samples and analysis allowing for a cost assessment to be undertaken for each element. It was found that many of the core items of plant where nearing the end of their usable lifespan with more energy e&cient op