Case Study
NewRiver Retail
Peter Brett (PBA) | NewRiver Retail NewRiver Retail PBA was appointed by NewRiver Retail to secure planning permission for convenience foodstores on a portfolio of public house sites across England and Wales, situated within more than 25 different local authority areas. PBA advised on the planning, heritage, acoustic, flood risk and ecological implications of the new stores. Given the geographical spread and spectrum of sites, a tailored approach was required to address the individual circumstances and constraints of each site. Issues that were addressed included: highway capacity, noise generation, proximity to conservation areas and listed buildings, flood risk mitigation, and the location of some sites within National Parks. PBA’s multidisciplinary team was uniquely placed to successful