Case Study

Network Rail

Network Rail

Pages 3 Pages

Demolition and reconstruction of the existing road over rail bridge deck during a 52 hour possession. The works also included waterproofing to the new bridge deck, new surfacing and services diversions. Scope of the Works Ashley Road Overbridge is a road over rail bridge on a very busy arterial road which connects the Boscombe area with the A338. Dyer & Butler demolished the existing bridge deck and constructed a new one. The wo

Join for free to read