Case Study

Eastern Docks Rail Modification, Southampton

Eastern Docks Rail Modification, Southampton

Pages 2 Pages

Removal and subsequent relaying of two rail sidings over a distance of 1.1km adjacent to the Queen Elizabeth 2nd Terminal in the Eastern Docks, Southampton. The work was completed in four phases comprising the removal of existing rails, sleepers and surfacing, and replacing with new rail and crossovers on a RC concrete slab (2 phases) and ballast (2 phases). The upgrade works were carried out to ABP specification to enable handling two tr

Join for free to read