Case Study
National Data Center Saves $500K On Annual Energy Costs
© 2016 CLEAResult 01/16 Talk to us Learn how CLEAResult can help you change the way you use energy. Contact us at 512.327.9200, info@clearesult.com or visit clearesult.com. DATA CENTER OPTIMIZATION CASE STUDY National data center saves $500k on annual energy costs A national company with a large data center in Austin, Texas, turned to CLEAResult to increase efficiency and reduce operating costs while improving redundancy, longevity and reliability CLEAResult analyzed and summarized records from the data center to understand energy usage and patterns, then designed a cooling retrofit using exhaustive research, extensive experience and proven technology. y Technology Improvements § 697-ton variable speed centrifugal chiller uses 80 percent less energy than existing unit § Ultra