Case Study

Modular VACS System Cleaned Wellbore and Retrieved Plugs in One Trip in Deepwater Well

Modular VACS System Cleaned Wellbore and Retrieved Plugs in One Trip in Deepwater Well

Pages 1 Pages

Benefits ? Reduced nonproductive time and operation risk ? Ensured success of frac-pack completion ? Minimized impact to perforation and formation Well background and challenges ? Gulf of Mexico, January 2010 ? Deepwater well with 2,949 ft (898 m) water depth ? 9 7 /8-in., 62.8-lb/ft casing ? 22,000 ft (6705 m) measured depth and 35° well angle ? The operator needed to clean perforation burrs, remove debris on top of packer plu

Join for free to read