Case Study

VACS System Successfully Cleaned and Verified Sump Packer Cleanliness in One Trip in Deepwater Well

VACS System Successfully Cleaned and Verified Sump Packer Cleanliness in One Trip in Deepwater Well

Pages 1 Pages

Benefits ? Reduced nonproductive time (NPT) and operation risk ? Minimized impact to perforation and formation ? Kept the metal shaving and other solids from suspending in the wellbore and reaching the surface equipment ? Minimized delayed production Well background and challenges ? Gulf of Mexico, August 2005 ? Deepwater well ? 7-in., 35-lb/ft casing at 22,439 ft, sump packer set at 22,098 ft ? 45° well angle ? CaBr 2 13.4

Join for free to read