Miami-Dade Wastewater High Level Disinfection Project Client: Miami-Dade Water and Sewer Department Location: Miami-Dade County, FL Hazen and Sawyer was retained by Miami-Dade County to provide fast- track planning, design, and construction administration for a 285-mgd high level disinfection (HLD) facility. The motivating force behind this project was a landmark Consent Decree, stipulating that the facility must be completed within ve years and also meet FDEP HLD reuse standards, as well as primary drinking water standards.A schematic drawing of the Miami Dade HLD facility. The aggressive project schedule required construction sequencing and close coordination with FDEP. Screw pumps were installed as part of the program. As part of the upgrade, seven 2.6 MW electrical service diesel ge