Case Study
Metro de Madrid Energy Efficiency Plan - replacement of lighting by LED technology of 115 stations and 4 depots.
Metro de Madrid Energy Efficiency Plan - replacement of lighting by LED technology of 115 stations and 4 depots.
Case Study energy solutions [Madrid Metro] 35a Victoria Road East Thornton Cleveleys FY5 5BU 01253 283050 enquiries@airisuk.com www.airisuk.com Airis Energy Solutions UKMetro de Madrid is a metropolitan rail network that serves the Spanish city of Madrid and its metropolitan area. Opened on October 17, 1919 by King Alfonso XIII, with a total of 301 stations, it is currently the largest metro network in Spain and the third in Europe, with a length of 294 kilometers. Case Study: Madrid Metro Background Airis LED Solution Within the second phase of the Metro de Madrid Energy Efficiency Plan, AIRIS products were chosen for the replacement of lighting by LED technology of 115 stations and 4 depots. Building Data Location: Madrid Surface Area: 294km LED Tube: 133,303 units in total