Case Study
Melba & Western Line
10b Industrial Drive PO Box 812 Ulverstone TAS 7315 Phone: (03) 6425 6530 Fax: (03) 6425 6112 Email: info@vec.com.au ABN 42 067 541 879 www.vec.com.au This project involved the placement of 46,000 steel sleepers, re-railing in excess of 61,000 metres of rail and removing 6,000 joints. To ensure that disruption to the critical rail network was minimised, all works were performed under live traffic. Over a duration of 18 months, the rail crews were working across remote areas throughout Tasmania. Resleepering By using an innovative method to replace 46,000 sleepers, VEC were able to utilise their specialised plant and equipment, resulting in high productivity in a challenging work environment. Welding With up to six weld teams conducting the works, above average