Railway Bridge Superstructure Replacement Package 2

Railway Bridge Superstructure Replacement Package 2

The ProjecT Client: T asRail Value: $796,000.00 Completed: 2011 10 b IndustrIal d rIve PO b Ox 812 u lverst One tas 7315 PhOne : (03) 6425 6530 Fax : (03) 6425 6112 e maIl : InFO @vec .cOm .au www .vec .com .au ABN 42 067 541 879 Railway Bridge Superstructure Replacement Package 2 The project consisted of the upgrade of the following: • Western Line, Back Creek - 3 span structure with an approximate overall length of 22 m • Western Line, Culvert No. 1 - a single span structure with an approximate span length of 1.8m • Western Line, Culvert No. 2 - single span structure with an approximately length of 1.4m • Western Line, Old Railton Yard Bridge - single span simply supported structure with an approximate overall length of 5.1m • Western Line, Chasm Creek - a si