Case Study

Medium Combustion Plant and Specified Generator Permitting

Medium Combustion Plant and Specified Generator Permitting

Pages 3 Pages

Permitting | Case Study Medium Combustion Plant and Specified Generator Permitting Project: Medium Combustion Plant and Specified Generator Permitting Location: Lancashire Regulatory Authority: Environment Agency Brief: Preparation of an Environmental Permit application and CHP-R assessment P R O J E C T Enzygo recently prepared an Environmental Permit application for a 49.9MWth gas-powered combustion plant. The facility is designed to participate in National Grid’s Short-Term Operating Reserve (STOR) program, providing local electricity supply during peak demand periods. The proposed plant is subject to the requirements of the Medium Combustion Plant Directive (MCPD). The MCPD was transposed into Schedule 25A of the Environmental Permitting (Engla