Wiltshire Biomass Boiler | Case Study Anaerobic Digestion Facility, Biomass Boiler Wiltshire Project: Sheffield Bottom Biomass Boiler Location: Reading Client: Alan Hadley Ltd Local Authority: West Berkshire Council Brief: Installation of a Biomass Boiler utilising grade A wood Part B environmental permit application Full suite of technical assessments for West Berkshire Council P R O J E C T The proposal was to obtain a Part B permit, under Section 5.1(B)(a)(v) of the Environmental Permitting Regulations, for the operation of a 999kw biomass boiler which would be utilising sorted grade A waste wood, sourced from an adjacent waste transfer facility. The renewable heat from the combustion of the waste wood is to be used to dry waste materials.