Flood Risk Activity Permit

Flood Risk Activity Permit

Pages 2 Pages

Flood Risk Activity Permit Radstock Project: Flood Risk Activity Permit Application Location: Radstock Client: UK Developer Regulator: Environment Agency Brief: Prepare a Bespoke Environmental Permit Application for a Flood Risk Activity P R O J E C T A house builder was required to reinstate a revetment in a main river as part of their building programme. As they were required to undertake works within a designated river the Environment Agency required them to have in place an Environmental Permit or exemption to ensure the river was protected whilst these works were carried out. This Permit is known as a Flood Risk Activity Permit (FRAP) and replaced the previous requirement to have in place a Flood Defence Consent for such works in April 20