Case Study

M1 Managed Motorways Widening Scheme

M1 Managed Motorways Widening Scheme

Pages 1 Pages

Case Study: M1 Managed Motorways Widening Scheme Client: Consulting Engineer: Services Provided: Location: Value: Year: www.stratageotechnics.com 01773 304056 info@stratageotechnics.com Strata Geotechnics secured the ground investigation on a 20 mile sec- tion of the M1 motorway between J28 and J31 to provide design infor- mation for the new structures associated with the ‘Managed Motorways’ active traffic management scheme. The ground investigation was to enable the design of gantry foundations, earthworks structures and to investigate for the presence of former coal mine workings and any issues with ground stability. Strata was on site for 20 weeks and drilled 52 no. boreholes to depths of up to 36m below ground level, using a combina

Join for free to read