Problem: At the foot of the picturesque Mt. Shasta in Northern California sits a very large biomass/wood-? red 13-MW Cogen system. The lumber mill’s system is needed to meet zero discharge facility demands, as well as ensure the longest maintenance cycle between shutdowns. The Cogen system not only sends energy to the grid, but provides the primary power for the production plant. The system is critical in ensuring maximum power availability