Case Study
Chile Steel Mill
Problem: A steel forging mill in Chile had a problem with sand getting into their process water cooling tower, requiring the company to replace the cooling tower fill every four months. The sand originated from casting of grinding media balls. Solution: The company installed two LAKOS JPX Separators in a series, upstream of the cooling tower (two SS-JPX- 0450-B/FLG Separators). This configuration is often called a “Super Separator”. Th