Case Study

LEAN Methods: Utilities

LEAN Methods: Utilities

Six Sigma Qualtec SNAPSHOTS OF SUCCESS LEAN Methods Case Studies UTILITIES www.ssqi.com toll free 800.247.9871 phone 609.925.9458 email info@ssqi.com Challenges Every 2 days, 120 rail cars filled with coal are delivered to the utility. However, the utility can handle only 60 cars at one time. The remaining 60 cars are warehoused at a local rail yard and switched out after the coal is emptied from the first 60 cars. Historically, the rail company

Join for free to read