Case Study

Utilities Case Study

Utilities Case Study

Six Sigma Qualtec SNAPSHOTS OF SUCCESS Utilities Case Studies IMPROVING PERFORMANCE WITH LEAN METHODS www.ssqi.com toll free 800.247.9871 phone 609.925.9458 email info@ssqi.com Maintenance Challenge In order to perform the required maintenance on a generator, our electric utility client had to power the unit down, complete all necessary work, and then restart the generator. The median cycle time for this process was 2.7 days. As any downtime is c

Join for free to read