Case Study
Juice Manufacturer Increases Pasteurization Uptime
© 2013 Rosemount Inc. All rights reserved For more information: www.rosemount.com Juice Manufacturer Increases Pasteurization Uptime RESULTS • Increased process availability • Reduced downtime associated with timing meter failure • Reduced maintenance costs APPLICATION HTST juice pasteurization timing system CUSTOMER A juice manufacturer in Europe CHALLENGE This manufacturer experienced reduced throughput due to inaccurate flow measurements on the pasteurization loop. Successful pasteurization requires precise control of flow and velocity of the juice through the pasteurizer. The flow rate determines the residence time of the juice within the pasteurizer. Incorrect residence timing results in inadequate pasteurization, which impacts product safety, resulting in the need for an addi