Dairy Manufacturer Increases Production Time in HTST Pasteurization Loop

Dairy Manufacturer Increases Production Time in HTST Pasteurization Loop

Pages 2 Pages

© 2013 Rosemount Inc. All rights reserved For more information: www.rosemount.com Dairy Manufacturer Increases Production Time in HTST Pasteurization Loop RESULTS • Increased process availability • Reduced downtime associated with timing meter failure • Reduced cleaning and loop recertification maintenance costs APPLICATION HTST dairy pasteurization timing system CUSTOMER A dairy processor in North America CHALLENGE This manufacturer experienced frequent timing meter failures due to the environmental conditions including high moisture, varying temperatures, and excessive vibration. This resulted in reduced throughput caused by process downtime, and excessive maintenance costs to replace and re-certify the loop according to the FDA Pasteurized Milk Ordinance (PMO). SOLUTION The Rose