Case Study

Intralox Case Study: THOKS | Intralox

Intralox Case Study: THOKS | Intralox

Pages 1 Pages

Intralox Case Study: THOKS | Intralox The coffee cake line at THOKS’s Waltershausen plant operates on a 24-hour production schedule. For three of those hours, the line stops so that the spiral freezer, a vital application, can defrost. In this area, the company had previously used a discontinued plastic stacker that never performed well. The plant’s maintenance team had tried implementing various fixes over the years. But even with extensive modifications and weekly scheduled maintenance, the system was prone to breakdowns and poor performance. THOKS officials needed a self-stacking spiral freezer that would fit within its limited existing footprint and allow the plant to continue operating two freezers. Most of the available options would have required THOKS to install a new freezer box,

Join for free to read