Interconnect Facility Study 100 MW Wind

Interconnect Facility Study 100 MW Wind

Interconnect Facility Study 100 MW Wind Interconnect Facility Study 100 MW Wind 100 MW Wind Generation Generation, Wisconsin This project consisted of a General Interconnection Facility Study submitted to Midwest Independent System Operator (MISO) by the Client, in which the Client provided the estimate for performance of an Interconnection Facilities Study for the Generation Interconnection Request, designated as G793. Facilities Study Summary: