Case Study

Integrated Approach

Integrated Approach

Pre-commissioning - Air Hygiene - Water Treatment Case Study: Integrated approach at iconic London building The project 122 Leadenhall Street, also known as the ‘Cheesegrater’ is an iconic addition to the London skyline. Guardian was brought on-board by Optimum to provide water treatment services and advice at construction and pre-commissioning cleaning stages, plus on-going water treatment, Legionella Risk Assessment and air hygiene servi

Join for free to read