Case Study

Water System Construction

Water System Construction

Pre-commissioning - Air Hygiene - Water Treatment Case Study: AOT Wallenius for water system construction The project In 2013, non-chemical water treatment Advance Oxygenation Technology (AOT) Wallenius, was trialled as an alternative to traditional chemically dosed fill and test water on the incoming mains of four large closed water systems at a construction project in the Midlands. Filling and pressure testing closed systems with treated

Join for free to read