Case Study

How Central Bank improved its construction loan process with Construct

How Central Bank improved its construction loan process with Construct

Pages 3 Pages

abrigo.com “Construct includes everything that we need to upload all the draw requests, invoices, and lien waivers for each project,” Zinn said. “And by allowing inspectors to enter their notes directly into each project, Construct makes the inspection process, which was one of the most time- consuming parts of the manual process, feel easy.” The inspection process can be a major pain point for financial institutions when it comes to construction lending. At Central Bank, inspectors would fill out forms by hand before turning them in for bank staff to enter digitally. With Construct, inspectors can log information and photographs directly to the software onsite, making them immediately available to Zinn alongside previous draw requests. “Everything’s right at our fingertips,” Zin

Join for free to read