Case Study

Horseshoe Dam Intake Tower Salt River Project

Horseshoe Dam Intake Tower Salt River Project

Pages 1 Pages

This study was performed to identify and analyze potential dam safety de? ciencies at the Horseshoe Dam Intake Tower, which was scheduled for modi? cations. The study was performed to evaluate the potential for structural or mechanical failure during the Maximum Credible Earthquake (MCE) which would result in either a loss of reservoir or damage to the structural and mechanical components, rendering them inoperable. The MCE f

Join for free to read