Case Study

High Velocity Aspirations

High Velocity Aspirations

Pages 2 Pages

High Velocity Aspirations FAAST overcomes installation and logistical difficulties at a mission-critical industrial chemical plant. Case Study: Chemical Plant Project: Chemical Plant MCC Room A large industrial chemical plant needed to install smoke detection in its motor control center (MCC) room, but shutting down the 800-acre stand-alone chemical plant to install the system could cost the plant $10 million a day in lost productivity .