Case Study
High Expansion Bridge Plug in The Middle East
Serving Every Well Challenge A major operator on the Arabian Peninsula faced problems in a well with a stuck lower master valve; they were unable to function the valve for nipple up/nipple down operations. With the OD of approximately 3.8” measured via drift, the client needed a solution to pass the restriction and be set in the 26# 7” tubing above the TRSSSV to secure the well. Region/Field: Key Capabilities: • Highest expansion retrievable