Case Study

First run Permanent Plug in Australia

First run Permanent Plug in Australia

Pages 1 Pages

Serving Every Well Challenge It was important for an operator’s well in Australia to remain hydrocarbon free to enable CO2 reinjection into the formation rather than into the atmosphere. The well was designed for water injection into the formation to assist removing the gas from other wells, however, the well was continually allowing oil and gas inflow instead of pumping water out. As a result of this, the client required a plug which would r

Join for free to read