Helix Producer 1 DTS Mooring And Installation
Helix Producer 1 DTS Mooring and Installation Helix Producer 1 DTS Mooring and installation SITE DETAILS: Location: Green Canyon Block 237 Region: Phoenix Field, GOM Water depth: 650-m (2,133-ft) SYNOPSIS: The installation of the Helix Producer 1’s disconnectable transfer system (DTS) in Green Canyon Block 237 of the Phoenix Field required top-notch engineering for its completion. WORK SCOPE: InterMoor’s original work scope revolved around the