Case Study

ATP Mirage MinDOC Mooring

ATP Mirage MinDOC Mooring

Pages 2 Pages

ATP Mirage MinDOC Mooring ATP Mirage MinDOC Mooring SITE DETAILS: Location: Mississippi Canyon Block 941 and Atwater Valley Block 63 Region: The Mirage and Telemark fields in the GoM Water depth: 4,000-ft (1,219-m) SYNOPSIS: The design and installation of the mooring system for the MinDOC deep draft floating platform for the Mirage and Telemark field development was the first permanent polyester mooring system allowed to be preset on the seabed

Join for free to read