Case Study
Delta House FPS – Mooring System
Delta House FPS – Mooring System Delta House FPS – Mooring System SITE DETAILS: Region: Mississippi Canyon 254 Block, Gulf of Mexico Water Depth: 4,400 ft (1341 m) Vessel: Joshua Chouest SYNOPSIS: Design, fabrication and installation of 12 suction pile anchors. Installation of 12 pre-set chain/ polyester mooring lines and hook up of the Delta House Floating Production System (FPS) in 4,400 ft. of water for LLOG. WORK SCOPE: InterMoor was respo