Case Study

Hejre hook-up campaign I

Hejre hook-up campaign I

Pages 1 Pages

Period: January 2014 - July 2014 Customer: TECHNIP France SAS OIL & GAS Max uptime for all assets Project description The Hejre Field is a DONG Energy A/S operated field in the Danish part of the North Sea, planned to be installed offshore summer 2015. Hejre Field is a high pressure high temperature reservoir, and is designed with an 8 legged steel jacket substructure equipped with a 12,000 tonnes topside. The topside is built in Korea, a

Join for free to read