Case Study

Haven for Hope

Haven for Hope

Pages 1 Pages

The Situation In late 2008, the Haven for Hope embarked on an ambitious 18-month building campaign and engaged Zachry Construction as the general contractor. Zachry entered into a design-assist with a fixed price contract delivery method with TDIndustries to perform MEP work on a seven-building complex to pro- duce a high-quality facility within budget. TD’s challenges were to: • Work within a restricted and uniquely shaped site, • G

Join for free to read