Case Study

Fort Bliss Barracks

Fort Bliss Barracks

Pages 2 Pages

The Situation Sundt Construction, located in Tempe, Arizona, was awarded the Fort Bliss Infantry Brigade Combat Team Barracks construction project to design and build twenty-four 60 unit buildings in 25 months or face liquidated damages. The project consisted of 1,440 two-bedroom units and was built to LEED Silver standards with BIM modeling requirements. TDIndustries’ Multifamily team was hired by Sundt to serve as plumbing contractor for

Join for free to read