Case Study
GROUTING OF OFFSHORE SUBSTATION, GERMAN SECTOR NORTH SEA
OVERVIEW Core was contracted to provide grouting services for the installation of an offshore substation in the German sector of the North Sea. A high-strength material was used for this project which Core brought through the ZiE approval process. EQUIPMENT ? High strength grout mixing unit ? High strength grout pumps. SCOPE OF WORK ? 4 piles to be grouted ? 132 tonnes of material ? Water depth 28 metres ? Grout was pumped 110 meters to pile. OPERATIONS ? Material delivered in 1500Kg bags in 20ft containers to the installation site ? 3000Kg were mixed at a time in Core’s orbital mixing unit. ? >20 MPa strength achieved 24 hours after job completion ? Grout levels in the annulus were checked to confirm a good connection. GROUTING OF OFFSHORE SUBSTATION, GERMAN SECTOR NORT