Case Study

DEME SAVES CRITICAL VESSEL TIME WITH GROUTING SOLUTION

DEME SAVES CRITICAL VESSEL TIME WITH GROUTING SOLUTION

Pages 1 Pages

DEME SAVES CRITICAL VESSEL TIME WITH GROUTING SOLUTION www.acteon.com The client required that grout be installed at a consistent rate, with minimal maintenance time between operations to ensure grouting activities were kept off the critical path. Project Name: SeaMade Offshore Wind Farm Location: Belgium Region: Europe Client: DEME Group Work Scope: Installation of high-performance grout on 58 monopile WTG foundations and two offshore substation foundations on the SeaMade offshore wind farm in the Belgian North Sea. THE PROBLEM With a 487 MW capacity, SeaMade is the largest offshore wind farm in Belgium and will feature 58 Siemens Gamesa Renewable Energy (SGRE) SG 8.0-167 DD wind turbines. DEME needed high performance grout material to be installed in the MP/TP skirt on each mono