Green’s Beer and Wine
Rooftop Solar PV CASE STUDY VELOSOLAR.COM Installment Time System Size ROI Payback Period Energy Savings 57 kW 2 years 20% Green’s Beer and Wine PROJECT GOALS Atlanta retailer Green’s Beer and Wine was spending $2,500 per month in utility bills to serve its customers and store its inventory. But Green’s 57 kW solar PV rooftop installation is helping the company live up to its name. Designing the solar array was a challenge because of the roof’s odd shape and multiple obstructions, but Velo engineers were able to create a system design which maximized the useful space. By saving the store $12,000 per year, the cost of Green’s solar system was recouped just two years after its installation in 2010. And the panels will continue to provide power for Green’s energy needs for decades. Pro