Case Study

Fuel Flowmeter Test Facility

Fuel Flowmeter Test Facility

Pages 2 Pages

Crane Aerospace / ELDEC Lynnwood, WA Harris Group provided schematic and detailed design for a new building housing process utility systems to test and certify the functioning of aircraft mechanical /electrical components. Design activities included pre-project conceptual development / feasibility studies; code compliance, NFPA, and FM Global requirements for safe handling of fuel at high pressures and temperatures; master site planning studies; nal site development; and design development through construction support. The facility supports ow meter calibration test stations and uid handling skids, o ce space, assembly work areas, employee spaces such as a safety and rst-aid room, lockers, toilets, skid maintenance, utility yard, and mechanical and electrical equipment for a fully fun

Join for free to read