Case Study
Consolidated Rental Car Facility
Port of Seattle SeaTac, Washington The facility supports all airport-related rental car operations at one convenient location. The facility is ve levels totaling 2,100,000 square feet and is located on a 23-acre site. Harris Group provided electrical, communications/IT and mechanical design elements. Work included power distribution (medium- and low-voltage), lighting (interior and exterior), DDC system, HVAC, re protection, plumbing, and communication/IT systems (telephone, wi- , ber optic backbone). The Challenge: Multiple stakeholders required Harris Group to manage coordination and collaboration. An extremely large oorplate required design to address the inherent system losses and higher cost associated with long runs; mechanical/electrical/plumbing (MEP), and communication system