Case Study

First Run Pump Open Sub In Uk

First Run Pump Open Sub In Uk

Pages 1 Pages

Serving Every Well Challenge The client had trouble with a well taking losses into the formation, so they required a deep-set barrier and a secondary shallow barrier to allow recovery of the Xmas Tree prior to pulling the completion. Region/Field: Key Capabilities: • ISO 14310 qualified • Allows temporary barrier • Opens at predetermined differential pressure • The 4.20in POS has the option of remote equalization, enabling production/i

Join for free to read