Project Fire Mains, Cooling Water cASe StUDY LocAtion Karstø, Norway enD USer Statoil, Norway contrActor Veidekke and Astrup Høyen for underground Fabricom, Umoe for aboveground conSULtAnt Linde Munchen, ABB Kellogg, Norconsult comPLetion DAte 1983-present DeScriPtion This gas processing plant, one of the largest in the world, was built in 1983. For the underground fire water and cooling water applications, glassfiber reinforced epoxy has been used from the start. The metal (CuNi) aboveground applications which were used in 1983 have since then been replaced by GRE. For both the under- and aboveground extensions that are being built, GRE is and will be used. PiPe SYStem Several pipe systems have been supplied ranging from 50mm to 1400mm. As well as conductive (aboveground) and no