Case Study
Fire mains LNG Terminal Fos Cavaou
Project Fire mains LNG Terminal Fos Cavaou cASe StUDY LocAtion Fos Cavaou, France enD USer Gaz de France DeSiGn PreSSUre 16 bar DiAMeter rAnGe (MM) 25 mm up to 500 mm ProDUct Wavistrong EST 16 APPLicAtion Fire main coMPLetion DAte 2008-2009 MArKet SeGMent Oil & Gas DeScriPtion A just installed pipe system from a different supplier had serious failures at the time of testing and therefore had to be replaced. The fire main has been replaced by Wavistrong series EST 16 from 25 mm up to 500 mm in adhesive bonded system. The total value for the complete supply, installation and engineering for the fire main replacement was around EUR 2 million. ScoPe Our scope included: • Engineering • Supply of Wavistrong GRE pipe system • Supervision • Installation the FPi ADvAntAGe The fire mains are f