Case Study
Cooling Water, Fire Mains
Project Cooling Water, Fire Mains cASe StUDY LocAtion Offshore Angola enD USer Elf Exploration Angola contrActor Ponticelli Europipe conSULtAnt Technip France comPLetion DAte 1996 DeScriPtion This oil platform in the Cobo oil field, along the African coast, has been equiped with firemains and cooling water lines in glassfiber reinforced epoxy. PiPe SYStem - Firemain system: up to 500mm diameter, 25 bars - Cooling water system: up to 900mm diameter, 16 bars Total project value has been approximately USD 1,250,000 ScoPe • Engineering • Fabrication • Supervision • Installation the FPi ADvAntAge Corrosion resistance and light weight have been the main reasons for choosing GRE in this project.